HomeChoose a pulper in four practical steps

Fruitpulper.com / Equipment and process

Choose a pulper in four practical steps

Start with what enters the machine and what must leave it—not just the nameplate rate.

Photo-guided presentation of the two-stage fruit pulper chamber arrangement and interstage transfer
Presentation edit based on an actual two-stage equipment photograph. Confirm chamber layout, connections and dimensions on the selected drawing.
01

1. Identify hard bodies

Large stones need a qualified stone-handling duty. Compare the dedicated destoner-pulper with a DJ chamber only after defining the inlet and stone envelope.

02

2. Define the finished pulp

Specify texture, retained fibre and seed or stone-fragment requirements. Decide whether one screened separation is enough or coarse pulping and finer finishing need separate stages.

03

3. Name the capacity boundary

Use prepared-feed kilograms per hour, not an unexplained whole-fruit, puree or daily production figure. Compare the five DJ catalogue sizes with that basis attached.

04

4. Agree a material trial

Inspect collected product, reject loss and hard-body damage over the same interval. Use the results to choose screen arrangements and acceptance criteria.

Equipment quotation

Tell us what the machine will process.

Send the fruit, prepared-feed rate and target pulp or puree. Include a drawing or trial record when available; you can enquire without a screen size.

Request a quotation
Discuss your equipment

Component details